Working documentation
We prepare a complete set of documents for the implementation of the project, including drawings, specifications, and descriptions. This guarantees high-quality execution and allows the project to be realized in strict accordance with the original plan.

List of provided documentation:

1. Demolition plan.
2. Installation plan.
3. Plan after restructuring. Technical specifications for the construction of partitions.
4. GKL structures. General plans for each room (if necessary).
5. Required elevations and sections of GKL structures (if necessary).
6. Doorway plan-scheme.
7. Furniture arrangement plan.
8. Wall finishing plan-scheme.
9. Floor waterproofing plan.
10. Floor covering layout plan indicating type and direction.
11. Warm floor plan-scheme, heating system, and placement of heating control units.
12. Ceiling plan indicating heights and necessary construction sections.
13. Lighting placement plan-scheme and required sensors.
14. Lighting placement plan-scheme and required sensors with coordinates.
15. Switch placement plan-scheme and required sensors.
16. Switch placement plan-scheme and required sensors with coordinates.
17. Socket placement plan-scheme and required sensors.
18. Socket placement plan-scheme and required sensors with coordinates.
19. Low-voltage cable outputs plan (audio, video, internet, wires with height indications). Plan for the placement of acoustic and multimedia devices.
20. Technical specifications for ventilation and air conditioning. Diffuser placement scheme.
21. Plumbing equipment placement plan-scheme.
22. Wall naming scheme.
23. Elevations of all rooms with material calculations and detailed sections for all decorative areas.
24. Built-in furniture elevations.
25. Bathroom elevations with plumbing equipment placement.
26. Drawings of decorative and author elements.
27. Summary statement of finishes indicating the necessary quantity of all materials.